Zhejiang Thermal Power and Longi Solar Sign Contract for Kom Ombo 200 MW Project in Egypt
01 Jun 2023

Read the full original full article here from solar quarter

Zhejiang Thermal Power Construction Co., Ltd. and Longi Solar Technology Co., Ltd. have signed a module purchase contract for the Kom Ombo 200 MW Project in Egypt during the SNEC Exhibition on May 25, 2023. The signing ceremony was attended by Mr. Yu Wei, member of the Party Committee and vice president of Zhejiang Thermal Power, and Mr. Dennis She, vice president of Longi Group.

The Kom Ombo project, located in the city of Kom Ombo in Egypt, will have an installed capacity of 200 MWac and a DC capacity of 230 MW, along with a 220 kV Booster Station. ACWA Power is the developer of the project, while the EPC contract has been awarded to a consortium consisting of China Power Engineering Consult and Zhejiang Thermal Power, affiliated with China Energy Engineering Company (CEEC group). Longi Solar will supply high-efficiency mono PERC bifacial modules for the project. The project aims to provide power to approximately 130,000 households and reduce carbon emissions by 336,000 tons annually, contributing to Egypt’s energy transition and economic and social development.